Report
568
the
Back design must be accompanied by a concise report detailing the suggested construction of foundations, the superstructure, the accommodation proposed, the mode of lighting, heating and ventilating and the materials to be used in the construction of the building.
Estimates.
Separate estimated cost be given in the following order :-
A. Estimated cost of foundations including drainage
B. Estimated cost of superstructure including permanent fittings
C. Estimated cost of Lighting, Heating & Ventilation
Total $
The total cost exclusive of Architect's commission, not to exceed five hundred thousand dollars ($500,000)
Page 570
Page 571
6
Report
568
the
Back design must be accou panied by a concise report detailing the suggested construction of foundations, the superstructure, he accourccrodation proposed, the mode of lighting, heating and ventilating and the materials
construction of
to be used in
the building.
Estimates.
Separate estimated crest be given in the following order :- A. Estimated cost of forcedations
including drainage
B. betimeated cost of superstructure
inrelieving are permanent fittings #
c. Satimeand cost of Lighting.
bost.
Heating & Vaclitation
Total $
The total cost exclusive of Architect's comicuissione, not to weed Live hundred thousand dollars (300, 0 0 0 ⋅ )
Page 570Page 571